Site review
We review the existing kitchen, structure, utilities and how you cook and entertain.

Kitchens are where a home is lived in most, and where layout, cabinetry, stone, appliances, plumbing, gas, ventilation and lighting all meet. We build them as one coordinated project, from opening walls to the last cabinet pull.
A great kitchen is decided in inches: clearances, heights and alignments. We resolve them on paper before anything is demolished.
Part of our interior and exterior remodeling work, serving Los Angeles County. Service areas.
Photographs and clips from Ludi projects in Los Angeles.



Every project is scoped to the property, but the sequence that protects the result stays the same.
We review the existing kitchen, structure, utilities and how you cook and entertain.
Layout, cabinetry, stone, appliances and lighting are confirmed with you and your designer, and long-lead items are ordered.
Electrical, plumbing, gas, ventilation and any wall changes are permitted with the right agency.
Walls, utilities and ventilation are reworked and inspected before they are closed.
Cabinets are set and leveled, then stone is templated from the installed cabinets and fabricated.
Appliances, fixtures and lighting are installed and tested, and every detail is reviewed with you.
Read more in our guide: Marble or quartzite? Choosing natural stone for a kitchen or bath.
A full kitchen remodel typically takes a few months of construction, and longer when walls move, utilities are relocated or custom cabinetry and stone have long lead times. Ordering appliances, cabinetry and slabs early is the best way to protect the schedule.
Usually, if the work changes electrical, plumbing, gas, ventilation or walls. In the City of Los Angeles, many kitchen remodels without structural changes can be permitted through an LADBS express permit; Santa Monica, Beverly Hills, Culver City and unincorporated County areas have their own processes.
Often, yes. If the wall is load-bearing, a structural engineer sizes a new beam and posts, and the change is permitted and inspected. Plumbing, ducts or wiring inside the wall also need to be rerouted.
Many clients do, with a temporary kitchen set up elsewhere in the house and dust protection around the work area. Larger renovations that affect several rooms or utilities may make a temporary move more comfortable.

Share the property location, what you would like to change and your timing. Our team will reply with a clear next step.